Balasore: The flood situation in parts of Odisha’s Balasore district has shown signs of improvement as the Subarnarekha River receded below the danger mark, bringing some relief to residents in flood-affected areas. However, several villages and roads remain submerged, and normal life is yet to return completely.
At Rajghat, the river was flowing at around 9.75 metres, below its danger level of 10.36 metres. Although the declining water level has eased concerns of further riverine flooding, water remains trapped in several low-lying areas.
37 Gram Panchayats Affected
The flood has affected 22 gram panchayats in Bhograi block and 15 gram panchayats in Baliapal block. Several villages in Jaleswar have also been impacted by the rising river water.
Residents in the affected areas continue to face difficulties in carrying out everyday activities. With floodwater surrounding homes and inundating connecting roads, access to markets, healthcare facilities and other essential services remains a major challenge.
Roads Remain Submerged
In several locations, floodwater is reportedly flowing more than four feet above road levels, disrupting communication between villages.
The submerged roads have made it difficult for residents to travel outside the affected areas. Many people are also struggling to access essential supplies as transportation remains disrupted.
Even though the Subarnarekha has started receding, the floodwater has not drained from several low-lying pockets. Residents are now waiting for the water to gradually recede so that roads can reopen and regular movement can resume.
Falling River Level Brings Relief
The decline in the Subarnarekha’s water level has provided some relief to residents and authorities monitoring the flood situation. However, the situation remains challenging in areas where stagnant floodwater continues to surround villages and homes.
Authorities are keeping a close watch on the river and the affected areas as the water level continues to fall.
For thousands of residents affected by the flooding, the immediate priority remains the complete withdrawal of floodwater, restoration of road connectivity and a return to normal daily life.






